Sunday, January 8, 2012

Ralph

Once again my friend Ralph Hudson has really helped me out in the fabrication department. I'm doing a lower frame rail deletion on the Guzzi and hit some snags with lining up the lugs that attach the frame to the V11 timing cover. Luckily I had prepped a second frame which lined up much better and Ralph came up with an ingenious drilling solution to centre the lugs whereby there was no clamping or tweaking necessary to line everything up. The frame now fits onto the cover perfectly.

In addition to his day job owning and operating a successful fabrication company, building race winning vintage sprint bikes, record setting Bonneville bikes (see below) and an endurance GS Suzuki for Spa in 3 months, Ralph kindly and patiently lets me highjack his time. Thank you!!




Tuesday, January 3, 2012

Getting wired

Stripped the Guzzi down yesterday to do a lower frame rail delete modification.

Time to clean up the wiring.

Wednesday, December 28, 2011

Team Incomplete

Race engine


Doing a jig.


Street bike engine.




Street bike.


Race bike.


Wednesday, October 19, 2011

Writers block

While I still need to do a Spa report life goes on......

Plans are taking shape for a new engine. Here's the starting point:

Bought it on ebay and the seller tried to charge me $185 to ship it which is a bit of a rip off. After much wrangling and huffing and puffing he relented and only charged me $70. Which was still twice as much as it should've been.



Tuesday, September 6, 2011

Bikers Classic OK indeed!!!!

I'm still formulating my race report. Homework was never my strong point.

In the meantime: got the bike back last week. Here it is at Ralphs shop. Anything steel was rusted due to salt air from it being shipped back via ocean. More protective grease next time. Bike was torn down last Friday and everything looks good. I had a broken oil ring on the left side. Hence the oily deposits on the piston top. More soon.